02477 752 574
Unit 18, Dunns Close, CV11 4NF
COMMERCIAL SOLAR PV

Commercial solar designed around your site and electricity use.

Reduce imported electricity, make better use of your roof and build a clearer long-term energy strategy — with a system designed around when your business actually uses power.

COMMERCIAL SOLAR REVIEW

Tell us about the site.

Even rough figures help. A bill is enough to start.

Site-led design

Designed for the building, roof and operating environment.

Load-led modelling

Sized around demand, self-consumption and future loads.

Grid-aware

Connection and export requirements considered early.

Long-term support

Monitoring, handover and a clear aftercare route.

WHAT SHOULD SOLAR DO FOR YOUR SITE?

Start with the operating profile, not the number of panels.

Commercial solar can improve several parts of the energy strategy. The useful system size depends on roof space, daytime demand, connection limits and what the business needs to achieve.

ON-SITE GENERATION

Use the roof before buying from the grid.

Solar can supply part of the site's daytime electricity demand directly, reducing the amount imported at the prevailing business tariff.

  • Generate electricity where it is consumed
  • Reduce exposure to imported energy prices
  • Model savings against real operating hours
GRID IMPORT Use the roof first. On-site generation supplies part of the business demand during daylight hours.
HOW WE DESIGN COMMERCIAL SOLAR

A large roof does not automatically mean the right system.

The design needs to connect roof potential, electricity demand, connection limits and the investment objective. These are the four inputs that shape a credible proposal.

01

Consumption profile

Annual use, half-hourly demand, operating hours and expected changes to site load.

02

Roof, land and shading

Usable area, orientation, shading and any practical or planning constraints.

03

Structure and access

Roof condition, structural considerations, safe working space and installation access.

04

Electrical design

Supply capacity, distribution, metering, protection and inverter arrangement.

05

Connection and export

DNO requirements, agreed supply capacity and any export-limitation strategy.

06

Business case

Self-consumption, tariffs, capital route, target return, carbon goals and project timescale.

Image link
RECENT COMMERCIAL PROJECT

85kWp rooftop solar for a Birmingham construction business.

Sunergy installed a 160-panel rooftop array with a 75kW FOX ESS inverter, designed around the available roof and the client’s commercial electricity demand.

Generation and payback are forecasts based on the project design and agreed assumptions. Actual results vary with weather, consumption, tariffs, availability and other site factors.

Image link
THE BUSINESS CASE

70,000kWh a year means less electricity bought from the grid.

The forecast annual generation gives the client a practical starting point for assessing energy savings, carbon reduction and the return on the installation.

The important figure is not simply how much the array can generate. It is how much of that electricity the business can use on site, what would otherwise have been paid for grid power and how the assumptions hold up over time.

FROM SITE DATA TO COMMISSIONING

A commercial solar project should have a clear engineering route.

Each stage should reduce uncertainty, verify the design and make the next decision easier for the business.

01

Initial data review

Review bills, operating hours, the site, project goals and any half-hourly data available.

02

Desktop feasibility

Assess roof or land potential, indicative generation, self-consumption and connection considerations.

03

Survey and proposal

Verify access, structure, electrical infrastructure, scope, equipment and commercial assumptions.

04

Delivery and aftercare

Install, commission, configure monitoring, complete handover and provide the agreed support route.

THE COMPLETE INSTALLATION

Built for the roof, the electrical system and the business case.

Commercial solar is more than panels. The array, inverter, protection, cabling, monitoring and handover all need to work as one installation.

Image link

Completed 85kWp rooftop array

Image link

160 panels installed across the working roof

Image link

75kW FOX ESS inverter and electrical protection

COMMON QUESTIONS

Commercial solar, without the vague sales claims.

A bill is enough to begin. Half-hourly data, a roof plan and details of future electrical loads make the first assessment better.

We review usable roof or land, orientation, shading, site electricity demand, operating hours, connection limits and future loads. The system should be based on a credible use case rather than simply filling every available surface.
A recent electricity bill, site postcode, approximate operating hours and your project objective are enough to start. Half-hourly consumption data improves self-consumption and financial modelling.
Savings depend on generation, how much electricity is used on site, the avoided import tariff, export payments, system performance and project costs. We show the assumptions behind an estimate rather than presenting a forecast as a guarantee.
Yes, where it supports a defined objective. Storage should be modelled against the site load, solar surplus, tariffs, required power, usable capacity and any resilience requirement.
Many commercial systems require network assessment and may involve G99 or export-limitation requirements. The exact route depends on the existing connection, proposed generation and export position. Sunergy can support the relevant process.
Timescales depend on system size, surveys, structural considerations, access, equipment, network requirements and approvals. A formal proposal should identify the project stages and expected programme for the specific site.
PLANNING A COMMERCIAL SOLAR PROJECT?

Send us the site and electricity data. We’ll help work out whether solar stacks up.

A bill is enough to start. Half-hourly data, operating hours and a roof plan make the first assessment even better.