The right commercial battery size depends on how much power your business needs at once and how long it needs it for. You need both a kW rating and a usable kWh figure. Annual electricity consumption, the size of your solar array or the largest cabinet that fits outside are not enough to choose a system.
If you’re comparing proposals, ask each installer to show the demand the battery will cover, when it will recharge and what remains available after losses and reserve settings. Those answers make two apparently similar quotes much easier to compare.
Read the two numbers on the proposal
kW measures power: the rate at which the system can charge or discharge. kWh measures energy: how much it can store. A battery with plenty of energy can still have too little discharge power for a busy workshop, kitchen or bank of EV chargers.
For example, a hypothetical system able to deliver 100kWh of AC energy to the building could supply a steady 25kW load for four hours. If its maximum continuous output is 25kW, it cannot supply a 50kW load on its own, even for two hours. The grid would need to provide the balance during normal grid-connected operation.
Check what the capacity figure actually means. Nominal cell capacity, usable battery capacity and energy delivered to the building are different quantities. Ask whether the quoted figure includes the operating reserve and conversion losses. Avoid comparing one supplier’s nominal number with another’s usable number.
Choose the job before choosing the cabinet
A commercial battery storage assessment should identify the main objective. That might be storing spare solar, shifting purchases away from expensive periods or supporting a short period of high demand. Each needs a different operating plan.
- Storing solar: measure surplus generation after the building’s immediate demand, then identify later demand that can use it.
- Shifting electricity purchases: establish the amount of higher-priced consumption that can realistically be replaced, plus the time and power available for charging.
- Managing peaks: establish how far demand rises above the target grid import level and how long each event lasts.
- Backup: define the essential circuits, starting loads and required runtime separately. Backup needs suitable equipment, switching and protection; a storage cabinet alone does not guarantee it.
The Carbon Trust’s energy storage guide explains these different applications and the importance of site-specific selection. It was published in 2019: use it for the principles, rather than treating its historic cost figures as current quotations.
Ask for a year of data, not just the last bill
Half-hourly electricity records show when imports occur. Ideally, review 12 months so winter heating, summer cooling, holidays and shutdowns are represented. The Carbon Trust’s monitoring guidance notes that access to supplier data depends on the meter and contract; more detailed monitoring can reveal how individual processes use energy.
For a site with existing solar, grid imports are not total building consumption. Collect solar generation and export records too, using matching timestamps. Otherwise, a daytime load already supplied directly by the panels could mistakenly be counted as an opportunity for battery savings.
Check the units in the file. A reading of 20kWh over half an hour represents an average power of 40kW during that interval. It does not prove the instantaneous demand stayed at 40kW. Rapidly changing machinery loads may need finer monitoring before the discharge power is specified.
Flag unusual periods rather than deleting them without explanation. A temporary closure, new production line or planned charging installation can materially change the result. Keep confirmed future demand separate from a possible expansion.
A worked example: covering an evening load
Suppose a hypothetical business wants a battery to supply 30kW continuously for three hours after solar production has fallen. The building needs 30kW × 3 hours = 90kWh of delivered AC energy. The system must meet both requirements.
For this example only, assume 95% discharge efficiency and that 90% of nominal battery capacity is available within the chosen operating window. The corresponding nominal capacity would be approximately 90 ÷ 0.95 ÷ 0.90 = 105.3kWh, before allowing for auxiliary consumption, ageing or additional design margin.
That calculation is not a product recommendation. Manufacturers define usable capacity differently; if a quoted usable figure already accounts for the operating window, do not deduct it twice.
Charging also needs checking. At an assumed 90% AC-to-AC round-trip efficiency, returning 90kWh requires about 100kWh of charging electricity. Over a four-hour charging window, that averages 25kW, before any extra auxiliary demand excluded from that efficiency assumption. The site needs sufficient charging capability and spare import capacity alongside its other loads.
Check the connection and the savings separately
Available import capacity can restrict charging. Export limits, existing solar and the electrical infrastructure can also affect the design. National Grid Electricity Distribution’s customer limitation guidance explains that limitation schemes sit alongside applicable generation connection requirements. Setting export to zero is not a substitute for checking the required DNO application and approval.
A lower measured peak does not automatically reduce every charge on the bill. Ask which contractual charges actually change and whether an agreed capacity amendment is needed. Fixed charges should not simply disappear from a savings forecast.
For solar charging, include export income forgone. For grid charging, include the purchase cost and losses. Compare against the same site without the battery, using the same tariff, so a tariff-switching saving is not also credited to storage.
Avoid assuming a full cycle every day. Our guide to commercial solar when your business closes at weekends explains why surplus generation and useful later demand do not always line up. Holding energy back for emergencies also leaves less available for daily bill savings.
What a useful sizing proposal should show
Ask for the recommended continuous charging and discharge power, nominal and usable capacity, reserve settings, assumed losses and the expected operating schedule. The assessment should explain seasonal utilisation, any curtailed solar, the warranty’s relevant limits and what happens as capacity reduces with age.
Compare a smaller option with the proposed size. Extra capacity should have a clear purpose: covering additional demand, extending runtime or meeting a defined future requirement. A larger cabinet needs to earn its place in the design.
Send us the figures you have
A recent bill, site postcode, opening hours and details of existing solar are enough to start a discussion. Include half-hourly data if available, plus any planned machinery or EV charging. We can then identify what needs checking before specifying the system.
Sunergy Renewables is based in Nuneaton, supporting businesses across Warwickshire, Leicester, Leicestershire and the wider Midlands. Request a commercial battery assessment to explore a system sized around your business.